KC Storm Shelters · September 19, 2026
Complete this worksheet in your browser, then print or save as PDF. This site does not submit or save entries; your browser may restore form values. Keep personal details in your own copy.
Use the same model, scope and site assumptions. Mark each item INCLUDED, EXCLUDED, ALLOWANCE or UNKNOWN, and record the amount and explanation. A blank does not mean zero.
| Scope item | Bid A | Bid B |
|---|---|---|
| Shelter / enclosure | ||
| Complete door assembly | ||
| Delivery and unloading | ||
| Foundation evaluation / engineering | ||
| Concrete / foundation work | ||
| Anchoring and installation | ||
| Excavation and spoil removal | ||
| Permits and inspections | ||
| Taxes | ||
| Utility or electrical work | ||
| Landscape / surface restoration | ||
| Warranty and handover records | ||
| Other allowances | ||
| Priced subtotal | ||
| Unresolved scope |
Do not call the priced subtotal a complete total while scope remains unresolved. Read the worked comparison example.